12.4 Project Milestones and Progress Chart

Project Milestones represent the end points of planning steps. In the graph they are represented by a dot on the indicated day.

12.4 [1].png

It is also possible to change the colour of the bars in the graph in SETTINGS > LISTVIEW COLOURS.

12.4 [2].png

By selecting the Project Tasks module, and changing the colour linked to the value in the TYPE drop-down menu, you can obtain a result as follows:

12.4 [3].png